94' MOTORYACHT CONSTRUCTION
Page 1


April 7, 2005

This is the largest SCRIMP infusion project on the East Coast. Once the hull is vacuum
bagged, the entire infusion process will take 5 hours to load 23 55-gal drums of resin.


Resin will be  infused through 7,000'
of feeder hose, a 5 hour process.


Every connection must be checked.
There is no margin for any errors.


An elaborate staging system is suspended
 so nothing touches the vacuum system.


The entire hull is encased in
a 145' X 83' vacuum bag.


Constructing the forward compartment

Working on the engine bed

Forward port cabin

Forward starboard cabin